Procedure Shuth down GTG.

1.Yakinkan Genset.(olie,solar,Batteray,)

2.Open breaker 11kV out going trafo 400 KVA.

3.Genset Start Auto.

4 Breaker ATS pindah auto,ke posisi Genset

5.Ikuti perpindahan power normal GTG sampai genset sudah mensuplai ke semua panael2 perkantoran udah normal.

6.Open Breaker In coming.11kV

7.Open Breaker 52G.

8.Shut down GTG.

9.Ikuti perpindahan Auto breaker 52 AR/52AS,kalau gagal manual operate.

10.Pada speed nol yakin kan lube oil pump oil mist separator fan. Rachet pump start auto.

11.Tutup Valve Gas./blind plate

**Selamat bekerja utamakan keelamatan